top of page
  • Staff report

Notification of Road Closure at EPCC ASC A & B

The purpose of this notification is to inform you that the EPCC Physical Plant will be closing the road between the ASC A and B buildings (please refer to the drawing).



This road closure is necessary in order to complete the ASC traffic improvement project which will redesign the intersection between the two buildings.

This new design will provide a safer traffic and pedestrian corridor between the two buildings.

Beginning Thursday morning February 25, 2021, the existing road will be closed to through traffic at the locations marked in red.


It will remain closed until May 3, 2021 or until the project is complete.

This will require that all personnel who currently park in the rear of “B” building use the upper level “B” building parking lot and enter through the main “B” building entrance.


All deliveries need to be coordinated with Juan Lopez, 831-7846.


Please provide a 48-hour notice.

If you have any questions please contact Lilliana Sepulveda at 493-3191.

7 views0 comments

Recent Posts

See All
bottom of page